Available LNG Capacity to be offered for the next twenty four (24) Months.
The Technical Re-gasification Capacity (Sustained Maximum Send Out Rate), taking into account the Capacity of the Metering Station Agia Triada, equals to 12.470.000 Nm3/D or 150.263,500 MWh/D (assuming that 1.000 Nm3 = 12,05 MWh Gross Calorific Value (G.C.V.))
The minimum technical Re-gasification capacity or the Minimum Daily Send Out Rate of LNG Terminal is defined at 12.300.000 kWh/D, taking into account the minimum technical capacity of equipment.