Hellenic Gas Transmission System Operator S.A.
Εmergency Call
Εmergency Call
8001122222(+30) 2105551666
210 5551666
  • ΕΛ
  • EN
  • THE COMPANY
  • CORPORATE SOCIAL RESPONSIBILITY
  • PRESS CENTER
  • CONTACT
  • ΕΛ
  • EN
search
  • NATIONAL NATURAL GAS SYSTEM
    • National Natural Gas Transmission System
    • LNG Facility
    • Development of the NNGS
      • NNGS Development Study
      • NNGS Development Plan
      • European union list of projects of common interest
    • NNGS Operation Reports
    • Security of Supply
      • Emergency Plan
      • Supply Security Levy
  • REGULATORY FRAMEWORK / COMPLIANCE
    • Union Regulatory Framework
    • Greek Regulatory Framework
      • Ministerial Decisions
      • Decisions of RAE
    • Compliance
      • Compliance Officer Responsibilities
      • Code of Conduct
      • Compliance Program
      • Compliance Guide
      • Annual Reports of the Compliance Officer
      • Submit notification
        • Notification Submission
        • Notification Submission Online Form
  • PROJECTS
    • New projects under constructions
    • New Connections
    • Facilities
    • Incremental Capacity
    • Technical Job Specification List
      • Pipelines
        • Piping – Welding- Vessels
        • Civil
        • Piping
        • Electrical – Cathodic & Lightning Protection
        • Instrumentation
        • Insulation
        • Miscellaneous
      • LNG Installation
  • REGULATORY SERVICES
    • Transmission Services
      • Natural Gas Quality Specification
      • Standard Agreement & Other Documents
      • Transmission Tariffs
        • Charges Calculator
      • Commission Regulation (EU) 2017/460
      • NNGTS Operational Gas
        • NNGTS Operational Gas Consumption
        • Operational Gas Unit Charge
      • Linepack Calculation
      • NNGTS Maintenance/Calibration Program
    • Annex I of Regulation 715/2009
      • Relevant Points and Capacities (Technical/Booked/Available)
      • Additional Transportation Capacity for Delivery
      • Historical Data of Transmission System Operation
        • Historical Data of Natural Gas Quality
        • Historical Data of Natural Gas Deliveries / Off – Takes
        • Capacity usage at Entry / Exit Points – Historical Data
        • Secondary Market of Natural Gas Transmission System
        • Historical Data of Natural Gas Pressure in Entry Points
      • Οther Data
    • Balancing Services
      • Services Description
      • Annual Planning of Gas Balancing
      • Balancing Costs
      • Unaccounted For Gas(UFG)
      • Daily Balancing Gas Price
    • LNG Services
      • Services Description
      • LNG Quality Specifications
      • LNG Terminal Technical Data
      • Standard Agreement & Other Documents
      • LNG Tariffs
        • Calculator of LNG Charges
      • LNG Terminal Operational Needs/ LNG Facility Losses 2010-2020
      • LNG Facilities Maintenance Program
    • Users Information LNG
      • LNG Re – gasification Capacity
      • LNG Cargoes Unloading Program
      • Additional LNG Storage Space
      • Historical Data of LNG Operation
      • Total LNG Stock
    • Capacity Auctions
  • NON REGULATORY SERVICES
    • List of Supplementary Transmission Services
    • Additional LNG Services
    • Οther Non Regulatory Services
      • Polyethylene Welding Certification
      • Gas Metrology Services
      • Operation and Maintenance of Natural Gas Distribution Network
      • Natural Gas Odorization Services
      • Administrative, Technical & Meteorological user support in measuring stations
      • Vehicle Gas Refueling Stations (CNG)
      • Technical Consulting Services
      • Corrosion and Lightning Protection
      • Natural Gas Transmission System Technical Support
      • Non Destructive Testing (NDT) Services
      • Provision of Operational Data
      • Clients
  • SAFETY / ENVIRONMENT / QUALITY
    • Safety
    • Environment
    • Quality
  • ANNOUNCEMENTS
    • NNGS Users Information
    • Public Consultations
    • Procurement Procedures
  • THE COMPANY
    • Our Vision
    • Historical Background
    • Shareholders
    • Subsidiaries
    • Company Organization / Organizational Structure
      • Managing Team
    • Legislative Framework of Tendering Procedures
    • Financial Reports
    • Membership in International Institutions
  • CORPORATE SOCIAL RESPONSIBILITY
  • PRESS CENTER
    • Press Releases
    • Corporate Brochures
    • Multimedia
    • Press Kit
  • CONTACT
REGULATORY SERVICES
  • ΗΟΜΕ
  • REGULATORY SERVICES
  • ANNEX I OF REGULATION 715/2009
  • ADDITIONAL TRANSPORTATION CAPACITY FOR DELIVERY
A-AA+
  • Transmission Services
  • Annex I of Regulation 715/2009
    • Relevant Points and Capacities (Technical/Booked/Available)
    • Additional Transportation Capacity for Delivery
    • Historical Data of Transmission System Operation
    • Οther Data
  • Balancing Services
  • LNG Services
  • Users Information LNG
  • Capacity Auctions

Additional Transportation Capacity for Delivery

Methodology for the Assessment of the Additional Transportation Capacity for Delivery

  • 2018

    April 2018
    Kipoi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………….20.371.879 kWh/Day

    Report Additional Transportation Capacity for Delivery – April 2018

    March 2018
    Kipoi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point………………….27.877.308 kWh/Day

    Report Additional Transportation Capacity for Delivery – March 2018

    February 2018
    Kipoi Entry Point…………………………259.324 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – February 2018

    January 2018
    Kipoi Entry Point………………………………0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – January 2018

  • 2017

    December 2017
    Kipoi Entry Point………………………………0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – December 2017

    November 2017
    Kipoi Entry Point…………………………………..259.324 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – November 2017

    October 2017
    Kipoi Entry Point…………………………………….0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – October 2017

    September 2017
    Kipoi Entry Point…………………………………….0 kWh/Day
    Sidirokastron Entry Point……………………….0 kWh/Day

    Report Additional Transportation Capacity for Delivery – September 2017

    August 2017
    Kipoi Entry Point………………………………….0 kWh/Day
    Sidirokastron Entry Point…………………………..8.577.633 kWh/Day

    Report Additional Transportation Capacity for Delivery – August 2017

    July 2017
    Kipoi Entry Point………………………………….0 kWh/Day
    Sidirokastron Entry Point…………………………..5.361.021 kWh/Day

    Report Additional Transportation Capacity for Delivery – July 2017

    June 2017
    Kipoi Entry Point………………………………….0 MWh/Day
    Sidirokastron Entry Point…………………………..0 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2017

    May 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..25.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2017

    April 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..27.950,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2017

    March 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..20.425,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2017

    February 2017
    Kipoi Entry Point………………………………….0,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2017

    January 2017
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2017

  • 2016

    December 2016
    Kipoi Entry Point………………………………….0,000 MWh/Day
    Sidirokastron Entry Point…………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2016

    November 2016
    Kipoi Entry Point………………………………….260,000 MWh/Day
    Sidirokastron Entry Point……………………….4.300,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – November 2016

    October 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – October 2016

    September 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – September 2016

    August 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – August 2016

    July 2016
    Kipoi Entry Point…………………………………….0,000 MWh/Day
    Sidirokastron Entry Point……………………….0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – July 2016

    June 2016
    Kipoi Entry Point…………………………………..390,000 MWh/Day
    Sidirokastron Entry Point……………………….10.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2016

    May 2016
    Kipoi Entry Point…………………………………..5.980,000 MWh/Day
    Sidirokastron Entry Point……………………….48.600,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2016

    April 2016
    Kipoi Entry Point……………………………………390,000 MWh/Day
    Sidirokastron Entry Point……………………….38.700,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2016

    March 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point……………………….24.840,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2016

    February 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2016

    January 2016
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point………………………..0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2016

  • 2015

    December 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2015

    November 2015
    Kipoi Entry Point………………………………..260,000 MWh/Day
    Sidirokastron Entry Point……………………20.520,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – November 2015

    October 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point……………………3.780,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – October 2015

    September 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point…………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – September 2015

    August 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………7.020,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – August 2015

    July 2015
    Kipoi Entry Point………………………………..0,000 MWh/Day
    Sidirokastron Entry Point………………………9.180,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – July 2015

    June 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point………………………10.800,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – June 2015

    May 2015
    Kipoi Entry Point………………………………..910,000 MWh/Day
    Sidirokastron Entry Point………………………0,000 MWh/Day

    Report Additional Transportation Capacity for Delivery – May 2015

    April 2015
    Kipoi Entry Point………………………………..390,000 MWh/Day
    Sidirokastron Entry Point………………………38.700,360 MWh/Day

    Report Additional Transportation Capacity for Delivery – April 2015

    March 2015
    Kipoi Entry Point………………………………..390,015 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – March 2015

    February 2015
    Kipoi Entry Point………………………………..390,015 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – February 2015

    January 2015
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – January 2015

  • 2014

    December 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point………………………0 MWh/Day

    Report Additional Transportation Capacity for Delivery – December 2014

    November 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point……………………1.080 MWh/Day

    Report Additional Transportation Capacity for Delivery- November 2014

    October 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point……………………9.720 MWh/Day

    Report Additional Transportation Capacity for Delivery- October 2014

    September 2014
    Kipoi Entry Point………………………………..390 MWh/Day
    Sidirokastron Entry Point…………………..1.081 MWh/Day

    August 2014
    Kipoi Entry Point……………………………… 390 MWh/Day
    Sidirokastron Entry Point………………….6.480 MWh/Day

    July 2014
    Kipoi Entry Point……………………………….390 MWh/Day
    Sidirokastron Entry Point………………….7.560 MWh/Day

    June 2014
    Kipoi Entry Point……………………………….390 MWh/Day
    Sidirokastron Entry Point………………..10.800 MWh/Day

    May 2014
    Kipoi Entry Point……………………………..910 MWh/Day
    Sidirokastron Entry Point………………..6.540 MWh/Day

    April 2014
    Kipoi Entry Point……………………………..390 MWh/Day
    Sidirokastron Entry Point………………17.440 MWh/Day

    March 2014
    Kipoi Entry Point…………………………….520 MWh/Day
    Sidirokastron Entry Point…………………….0 MWh/Day

    February 2014
    Kipoi Entry Point………………………………0 MWh/Day
    Sidirokastron Entry Point……………………0 MWh/Day

Hellenic Gas Transmission System Operator S.A.
Site Map
  • NATIONAL NATURAL GAS SYSTEM
    • REGULATORY FRAMEWORK / COMPLIANCE
      • PROJECTS
        • REGULATORY SERVICES
          • NON REGULATORY SERVICES
            • SAFETY / ENVIRONMENT / QUALITY
              • ANNOUNCEMENTS
                AfterSiteMap
                Contact
                • DESFA Head Office
                • 357 -359 Mesogeion Av.
                • 152 31 Chalandri
                • Tel: +30 213 0884000
                • Fax: +30 210 6749504
                • Email: desfa@desfa.gr
                Εmergency Call
                Εmergency Call
                8001122222 (+30) 2105551666
                Links
                • Ministry Of Environment & Energy
                • RAE (Regulating Authority for Energy) in Greece
                • EDA Attica
                • EDATHESS Gas Distribution Company Thessaloniki - Thessalia SA
                • DEDA
                • ADMIE
                • LAGIE
                • ENTSOG
                • Gas Naturally
                • GIE
                • IGU
                Social Media

                © copyright DESFA 2018

                Top